SAP PP/QM Configuration Pack
Master Data Configuration. Define Bill Of Materials (BOM) Usage, Define BOM Status, Define Item Category…
Define Application, Define Work center Category, Define Parameters, Define Standard Value, Define Shift Sequence, Define Routing Selection – Automatic. MRP Related configuration settings. Plant parameters, Define MRP controller, MRP Plant Parameter – Float (Schedule Margin Key), MRP Plant Parameter – Special Procurement Key, Activating MRP and Planning file entries, MRP type, MRP Plant Parameter – Conversion, PRODUCTION EXECUTION. Define Order Type, Define Number Range for Order type, Define Scheduling Parameter for order type, Define confirmation parameters, Define Default Values…
Define Bill Of Materials (BOM) Usage. BACKGROUND. This configuration setting enables one to define Bill Of Material (BOM) usage. BOM usage defines the usage of BOM in a specific application area in SAP. Example, there can be a separate BOMs for Design, Production, Costing. In this way, each area is dealing only with the specific data it requires. Example: The design BOM includes all the components of the product and their technical data from the design point of view. This BOM is generally not linked to any order. The production BOM contains all the items required from the production and assembly point of view. Only items relevant to production, for which production data (such as the issue storage location) can be entered, are required. A production BOM does not contain any packaging materials required in the shipping department. SCENARIO. Create new BOM usage. Note: Standard BOM usage available with SAP is sufficient. However any new BOM usage can be created. INSTRUCTIONS. Follow the Menu Path: IMG? Production? Basic data? Bill of materials? General data BOM Usage Define BOM Usage 1. Click 2. Click 3. Enter usage value; it can be either numeric or alphabet. It is suggested to be numeric. 4. Select +,- or . to indicate to which area this BOM is meant for like Production, Engineering, Spare, Plant Maintenance, Sales or for costing relevancy. Note: Based on this, during BOM explosion, entrire dependent requirements are also planned, 5. Enter Usage text 6. Click Save. Impact of this configuration in Master Data / Transaction. When creating the BOM, key defined here will appear in the BOM Usage field. According to the requirement, BOM usage key has to be selected during BOM Creation. Click Match code or F4 in BOM usage field, to select the desired BOM usage. Transaction code to create BOM is CS01. Define BOM Status. BACKGROUND. This configuration setting enables to define BOM status. BOM status is used to define whether the BOM can be used by any application area or not. Example: In the costing areas in a company, the BOM is exploded according to the application. While defining the BOM status, usage in costing area will be defined. In MRP, the following indicators are checked directly from the definition of the BOM status: -Explosion in MRP – Released for orders…
Source: http://www.sap-topjobs.com/
Download SAP PP/QM Configuration Pack
Leave a Reply